
Add to Cart
Zinc Mining Thickener of Processing Plant Supplier
1. Product introduction:
High-efficiency thickeners are solid-liquid separation equipment based on gravity sedimentation, usually made of concrete or metal welded plates as structural materials to build cylindrical shallow grooves with a cone bottom. The high-efficiency thickener can concentrate the slurry with a solid weight of 10% ~ 20% by gravity sedimentation into an underflow slurry with a solid content of 45% ~ 55%. It can be installed in the thickener to run slowly (1/3 ~ 1/ 5r/min) the role of the rake, the thickened underflow slurry is discharged from the underflow opening at the bottom of the thickener. The upper part of the thickener produces clearer liquid (overflow), which is discharged from the annular chute on the top.
Name | Zinc Mining Thickener of Processing Plant Supplier |
Model | High-Rate Thickener |
Material | Zinc Lead |
3. Appearance and main parameters:
Model | Bridge structure | Angle | Diameter φ | Depth H | Inlet port | Overflow | Mud outlet | Motor Power |
α m m kw | ||||||||
NXZ-09 | Full bridge | 8° /9.5. | 9 | 2.5 | DN100 | DN100 | DN80 | 4 |
NXZ-12 | 12 | DN150 | DN150 | DN100 | ||||
NXZ-15 | 15 | 3 | DN200 | DN200 | DN150 | |||
NXZ-18 | 18 | 3.5 | 5.5 | |||||
NXZ-20 | 20 | DN250 | DN250 | DN200 | ||||
NXZ-24 | 24 | |||||||
NXZ-30 | 30 | DN300 | DN300 | DN200 | 7.5 | |||
NXZ-35 | 35 | |||||||
NXZ-38 | Half bridge | 6°+12°/9.5° | 38 | 3.5 | DN400 | DN400 | DN250 | 11 |
NXZ-40 | 40 | |||||||
NXZ-45 | 45 | DN500 | DN500 | DN300 | 15 | |||
NXZ-55 | 53 | |||||||
NXZ-60 | 60 | DN600 | DN600 | DN350 | 22 |
FAQ
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.